Bar stock cost per turned part: parts per bar, cut-off and the bar end

On a lathe the material cost of a part is not the weight of the part, or even the weight of its blank. It is a share of a whole bar: the blanks, the cut-off between them, and the end of the bar the chuck or bar feeder cannot use. That difference is easily 10 percent of the material line, and on small batches it can be most of it.

Length per part: blank plus cut-off

Start from the finished length, add a facing allowance for each end you face, then add the width of the parting tool, because that slice turns into chips:

length per part = finished length + facing allowance + cut-off width

A 80 mm part faced on both ends with 1 mm each, parted off with a 3 mm blade, uses 85 mm of bar.

Parts per bar, after the bar end

Every bar leaves a piece you cannot machine: what the collet or chuck holds on the last part, or the remnant a bar feeder ejects. 100 to 300 mm is common; measure yours. The parts a bar gives are:

parts per bar = ⌊(bar length − bar end) ÷ length per part⌋

Round down: a part that does not fit is not a part.

A worked example

1045 steel, Ø40 mm, bought in 3 m lengths at A$3.10 per kg. Part 80 mm long, faced both ends (1 mm each), 3 mm parting blade, 150 mm bar end.

StepValue
Weight of Ø40 steel bar (π ÷ 4 × 0.04² × 7,850)9.865 kg/m
One 3 m bar29.59 kg · A$91.74
Length per part (80 + 2 + 3)85 mm
Parts per bar ⌊(3,000 − 150) ÷ 85⌋33
Material per part, whole bar sharedA$2.78
Material per part, blank weight only (85 mm)A$2.60

The bar end alone adds 7% here; with a 250 mm bar end it would be about 10% (32 parts per bar).

Small batches pay for whole bars

If the job is 20 parts, you still cut into a full bar. Unless you will use the other 13 parts' worth of bar soon, the honest material cost is the bar:

QuantityBarsMaterialPer part
201A$91.74A$4.59
331A$91.74A$2.78
1004A$366.96A$3.67

The 100-off line is the one that surprises people: 100 parts need 3.03 bars, so you buy 4, and 32 parts' worth of steel goes on the rack. Whether you charge for it depends on how often that size moves. If it sits for a year, charge for it, or quote the quantity break at 99 and 132 so the buyer can choose.

Things that change the numbers